Before operating the tube furnace, some preparations need to be done first. First, check that the furnace is in working order and make sure all equipment and instruments are in good working order. Then, clean the furnace and pipes to make sure they are free of impurities and residue. Finally, prepare the required raw materials and samples to ensure that they meet the experimental requirements.https://www.antsmachine.com/gantry-column-structure-horizontal-straight-cutting-bandsaws-ch-1200.html
Set temperature and time
Before starting heating, the temperature and time of the furnace need to be set according to the experimental needs. According to the nature of the sample and experimental requirements, select the appropriate temperature range and heating time. Using the control panel on the stove, set the temperature and time to the desired values.https://www.antsmachine.com/double-column-gantry-horizontal-metal-band-sawing-machine-g42100.html
Preheating tube furnace
Before starting to heat the specimen, https://www.antsmachine.com/double-column-gantry-horizontal-metal-band-sawing-machine-g4265-2.htmlthe tube furnace needs to be preheated. Open the furnace door and place the sample in the center of the furnace. Then, close the furnace door and turn on the furnace's power switch. Depending on the set temperature and time, the stove will start to heat up. During the preheating process, closely observe the temperature changes of the furnace to ensure that it gradually reaches the desired temperature.https://www.antsmachine.com/double-column-gantry-horizontal-metal-band-sawing-machine-g4280.html
|